YONDEN Ikata No.3 unit enter regular maintenance from Oct 11
The 890MW No.3 unit at Shikoku Electric Power Co (YONDEN)'s Ikata nuclear power station, located in Ikata Town, Ehime Prefecture, would enter regular maintenance starting Oct 11. In the regular maintenance, which counts 18th for the pressurized water reactor (PWR) unit, the replacement of the primary valve as well as the fuel assembly was to be conducted. The resumption of power generation and the end of the maintenance are scheduled on Dec 25 and Jan 19 next year, respectively.
|